Redstone Missile Launch Operations Site
Battery A 1st Missile Battalion 333rd Artillery
40th Artillery Group (Redstone)
Kuhberg Hill, Bad Kreuznach, Germany
August 1961
Raising the missile to the vertical firing position.
The hydraulic jacks
are now commencing to engage the tilt ring,
preventing the missile from tumbling over the launcher,
and allowing the missile to be slowly lowered to the launcher.